515.243.4477
400 East Court Avenue | Suite 140 | Des Moines, IA 50309
engineer@shuck-britson.com

Sec Taylor Stadium

Location Des Moines, IA
  • Project
    • 10,000 Seat Stadium
    • 100,000 Sq. Ft.
    • $10.5 million construction cost
  • Services
    •  Structural Design
    • Construction Review
description

A steel roof structure with large cantilevered roofs and balconies achieves maximum spectator shelter and unobstructed view of the field. Precast prestressed concrete seating was designed for rapid erection and winter construction. Auger-cast piling foundations achieved solid support in poor quality soils along the Des Moines River.