515.243.4477
400 East Court Avenue | Suite 140 | Des Moines, IA 50309
engineer@shuck-britson.com

9th Street Parking Garage and Skywalk

LocationDowntown | Des Moines, IA
  • Project
    • 7 Level
    • 1200 Vehicle Capacity
    • $12.5 million construction cost
    • 323,000 Sq. Ft.
  • Services
    •  Structural Design
    • Construction Review
description

This ramp utilizes innovative tapered steel girders and precast floor slabs for rapid erection, positive drainage and long-term durability. Auger cast piling foundations minimized vibration and shoring problems in downtown Des Moines. Four tower elevators provide bracing and enhance access for patrons, with connection to the Skywalk System via a 106’ enclosed span hung from plate girders.


>>Download a pdf of this project sheet