515.243.4477
400 East Court Avenue | Suite 140 | Des Moines, IA 50309
engineer@shuck-britson.com

Raccoon River Bridge

Location SW 3rd Street Bridge | Des Moines, Iowa
  • Project
    • 557.3' x 62' Pretensioned Prestressed Concrete Beam Bridge with Sidewalk
    • $2.2 million construction cost
  • Services
    •  Structural Design
    • Construction Review
description

The SW Third Street bridge spans the Raccoon River near the new Sec Taylor Stadium. The bridge opens a new access corridor into downtown Des Moines from the South Side. The open concrete rails and ornamental iron rails were designed to complement the architectural features of nearby Sec Taylor Stadium. The beams were set for clearance above the record flood levels of 1993. An eight foot wide sidewalk with pedestrian observation modules was provided for pedestrians, bicyclists and fishermen. This project qualified for 80% federal funding, and SBI performed construction review services to assure full city reimbursement for eligible costs.