515.243.4477
400 East Court Avenue | Suite 140 | Des Moines, IA 50309
engineer@shuck-britson.com

High Trestle Trail Bridge

LocationPolk County
  • Project

    103.9 x 20.7 m Pretensioned Prestressed Concrete Beam Bridge w/ 3.0 m Sidewalk

  • Services
    • Structural Design
    • Construction Review 
  • Cost
    • Interchange Project $7.3 million
    • Bridge $2 million
description

The High Trestle Trail Bridge was transformed from an abandoned rail line into an iconic destination bridge for pedestrians and bicyclists along the High Trestle Trail between Madrid and Slater.  The art enhancements on the bridge recollect the coal mining history of the area. 

This bridge soars 130 feet over the Des Moines River Valley.  During daytime hours, breathtaking panoramic views of the valley and rolling hills can be seen from the bridge and overlooks, which provide safe rest intervals and feature interpretive wildlife and historical exhibits.  During the night time hours, illuminated crib frames mounted along the bridge provide a stunningly different experience.  Massive monoliths, located one-half mile apart at each end of the bridge and fashioned to mimic limestone bluffs with coal seams, announce the bridge as trail users approach from either direction.   

 


>>Download a pdf of this project sheet